V&D Interiors are excited to announce we have secured the load bearing SFS and drylining package to create a drive through medical centre.
We will be constructing 5 structures which will provide 9 clinical and admin rooms and various storage rooms.
V&D Interiors will be forming the structures using special designed load bearing SFS walls and roofs. The roofs will be clad with plywood and filled with insulation. The walls will be insulated using rock wool and lined with plasterboard and finished with a skim coat.
This is a fast track project where all structures need to be completed in 6 weeks with a 3 week material and design lead time . V&D Interiors was awarded this scheme based upon our successful delivery of other similar schemes.
“Drive Through” Medical Centre, Birmingham