![](https://i0.wp.com/vd-interiors.co.uk/wp-content/uploads/2024/02/14732_000811098_IMG_07_0000.jpeg?resize=1024%2C768&ssl=1)
Sector: Luxury Apartments
Main Contractor: Clegg Construction
Scope of works: Drylining, SFS, Sheathing Boards, Partitioning, Suspended Ceilings and Plastering.
Project Value: £1,550,000
Apex Loft is a luxury apartment block consisting of 80 apartments spread across 8 storeys located in Digbeth Birmingham.
We carried out the partition, SFS, plastering and ceilings package. We formed all external and internal walls and ceiling using a full thru the wall Siniat/ EOS system from weather defense on the outside to EOS SFS framework to Siniat internal boards on the inside. This fully tested system will provide the client with a 25 year warranty.
We delivered this scheme for Nottingham based main contractor Clegg Construction. We were awarded this scheme based upon based upon the successful delivery of a 199 apartment block in Birmingham.
![](https://i0.wp.com/vd-interiors.co.uk/wp-content/uploads/2024/02/14732_000811098_IMG_00_0000.jpeg?resize=1024%2C576&ssl=1)
![](https://i0.wp.com/vd-interiors.co.uk/wp-content/uploads/2024/02/14732_000811098_IMG_01_0000.jpeg?resize=1024%2C576&ssl=1)
![](https://i0.wp.com/vd-interiors.co.uk/wp-content/uploads/2024/02/14732_000811098_IMG_02_0000.jpeg?resize=1024%2C576&ssl=1)
![](https://i0.wp.com/vd-interiors.co.uk/wp-content/uploads/2024/02/14732_000811098_IMG_04_0000.jpeg?resize=1024%2C576&ssl=1)
![](https://i0.wp.com/vd-interiors.co.uk/wp-content/uploads/2024/02/14732_000811098_IMG_05_0000.jpeg?resize=1024%2C576&ssl=1)